Owner/Location
NALCO, Angul (Odisha)
Mode of Execution
Project Management Services
Key Features
Brown field smelter capacity augmentation from from 0.345 MMTPA to 0.460 MMTPA.
Pot room, Carbon Area, Cast House, Raw Material Handling, Utilities & Offsites, Alumina Unloading etc.
Total Project Cost
Rs.1600 Crore
Schedule
45 Months
Process
Zero Effluent discharge
Engineering
- Introduction of state-of-the-art technology i.e. HDPS for continuous feeding of alumina to the pots & Pot Regulation System (Alpsys).
- Centralized compressed air system designed to cater the requirement of compressed air for better logistics, cost benefit & low maintenance.
Procurement
120 nos. of vendors dealt with for procurement.
Construction
20 nos. of contractors engaged at site including package contractors.
HSE
No Loss Time Accident
Cost Saving
Integration of cathode sealing area by procuring induction furnace, heating system and shot blasting machines separately, thereby reducing cost.