DEEN DAYAL FIELD DEVELOPMENT PROJECT
Deen Dayal Field Development Project
  • Project Summary
  • Unique Challenges
  • Achievements
Deen Dayal Field Development Project

Owner/ Location    
GSPC, KG Basin

Mode of Execution         
Project Management Services

Key Features
    
Overall Capacity
200 MMSCFD

Major Processing Units

  •     WHP: HIPPS
  •     PLQP : Gas Dehydration unit,  Waste heat recovery, GTG (5MV), Flare
  •     WHP : Provision for Drilling, Helideck
  •     PLQP: Living quarter (45 Persons), Helideck, Bridges to WHP and Flare Tripod, Survival Craft-2 Nos
  •     Pipeline : Slug Catcher & Isolation Valve Station with associated facilities


Cost     
Rs.3400 Crore

Schedule
39 Months

 

Project  
New field development in KG Basin.

Process
Facilities designed for Well fluid at High Pressure (15000 psi at WHP and 1500 psi at PLQP), High temperature (152°C at WHP and 50°C at PLQP).

Engineering     
Complex design of PLQP Deck in 2 parts- North deck(2300MT) and south deck(3900MT), Living quarter(3100MT) and TG module (2350MT) on a 4 legged platform. Layouts were reviewed critically to enable maximum space utilization

Procurement        

  • Deck, Jacket and module fabrication carried out at Hazira/Kattupalli and in Malaysia.
  • Total steel procured and delivred at yard : Approx. 30000 MT.

Construction       

  • Heaviest lift during installation – 3900 MT
  • Concurrent working of various contractors in the offshore location

 

HSE
No lost Time Accident