Owner/ Location
GSPC, KG Basin
Mode of Execution
Project Management Services
Key Features
Overall Capacity
200 MMSCFD
Major Processing Units
- WHP: HIPPS
- PLQP : Gas Dehydration unit, Waste heat recovery, GTG (5MV), Flare
- WHP : Provision for Drilling, Helideck
- PLQP: Living quarter (45 Persons), Helideck, Bridges to WHP and Flare Tripod, Survival Craft-2 Nos
- Pipeline : Slug Catcher & Isolation Valve Station with associated facilities
Cost
Rs.3400 Crore
Schedule
39 Months
Project
New field development in KG Basin.
Process
Facilities designed for Well fluid at High Pressure (15000 psi at WHP and 1500 psi at PLQP), High temperature (152°C at WHP and 50°C at PLQP).
Engineering
Complex design of PLQP Deck in 2 parts- North deck(2300MT) and south deck(3900MT), Living quarter(3100MT) and TG module (2350MT) on a 4 legged platform. Layouts were reviewed critically to enable maximum space utilization
Procurement
- Deck, Jacket and module fabrication carried out at Hazira/Kattupalli and in Malaysia.
- Total steel procured and delivred at yard : Approx. 30000 MT.
Construction
- Heaviest lift during installation – 3900 MT
- Concurrent working of various contractors in the offshore location
HSE
No lost Time Accident